[{"data":1,"prerenderedAt":134},["ShallowReactive",2],{"contact-global":3,"experience-419-2026-greenmount-to-cambooya":37},{"addresses":4,"emails":14,"phones":18,"socialLinks":28},[5,8,11],{"address":6,"countryCode":7},"177 Wellington Road, East Brisbane QLD 4169","AUS",{"address":9,"countryCode":10},"250 B Boulevard Saint-Germain, 75007 Paris","FR",{"address":12,"countryCode":13},"188 Quay Street, Auckland Central, Auckland 1010","NZ",[15],{"countryCode":16,"email":17},null,"info@futureproofsolutions.com.au",[19,22,25],{"countryCode":7,"longPhoneNumber":20,"shortPhoneNumber":21},"+61 1300 391 434","1300 391 434",{"countryCode":10,"longPhoneNumber":23,"shortPhoneNumber":24},"+33 01 82 72 61 24","01 82 72 61 24",{"countryCode":13,"longPhoneNumber":26,"shortPhoneNumber":27},"+64 09 973 4119","09 973 4119",[29,33],{"socialNetworkLink":30,"socialNetworkType":31},"https://www.facebook.com/people/Future-Proof-Solutions/100057368412879/",[32],"facebook",{"socialNetworkLink":34,"socialNetworkType":35},"https://au.linkedin.com/company/futureproof-solutions",[36],"linkedin",{"experience":38},{"seo":39,"title":40,"excerpt":44,"description":45,"projectStatus":46,"date":47,"detailedLocation":48,"boreholeDiameter":49,"crossingLength":51,"designTypes":54,"crossingTypes":61,"methods":72,"pipeUtilisations":77,"pipeTypes":82,"location":48,"smartLocation":91,"specifications":97,"background":98,"cardBackground":101,"sliderDescription":104,"crossings":106},{"title":40,"description":41,"keywords":42,"image":43},"2026 / Greenmount to Cambooya","Engineering design and supporting calculations were completed for two Auger Bore crossings at Greenmount and Cambooya as part of the Toowoomba to Warwick (T2W) Pipeline project, enabling the installation of a new trunk water main beneath road and rail infrastructure.","",{"url":42,"alt":42},"\u003Cp>Engineering design and supporting calculations were completed for two Auger Bore crossings at Greenmount and Cambooya as part of the Toowoomba to Warwick (T2W) Pipeline project, enabling the installation of a new trunk water main beneath road and rail infrastructure.\u003C/p>\n","\u003Cp>The Toowoomba to Warwick (T2W) Pipeline project forms part of a regional water security initiative aimed at strengthening the long-term water supply for communities across the Toowoomba region. Engineering design and supporting calculations were developed for two Auger Bore crossings located at Greenmount and Cambooya to facilitate the installation of a new DN200 trunk water main. The proposed crossings were designed to safely traverse both road and rail corridors, providing a reliable trenchless solution where conventional open-cut construction was not practical. By carefully planning the bore alignments, the project enabled efficient pipeline installation while preserving existing transport infrastructure and supporting the delivery of critical water services to the surrounding communities.\u003C/p>\n","completed","2026","Greenmount, QLD 4359 — Toowoomba, Australia",{"min":50,"max":50},25,{"min":52,"max":53},31,69,[55],{"id":56,"slug":57,"title":58,"shortTitle":58,"excerpt":59,"method":60},"cG9zdDoxMTQ=","horizontal-auger-boring","Horizontal Auger Boring","\u003Cp>Limited-steerability trenchless method for straight crossings\u003C/p>\n","AUGR",[62,67],{"id":63,"termTaxonomyId":64,"name":65,"description":66},"dGVybToxMg==",12,"ROAD","Road",{"id":68,"termTaxonomyId":69,"name":70,"description":71},"dGVybToxMQ==",11,"RAIL","Rail",[73],{"id":74,"termTaxonomyId":75,"name":60,"description":76},"dGVybTo0",4,"Auger Boring",[78],{"id":79,"termTaxonomyId":80,"name":81,"description":81},"dGVybTo1Ng==",56,"Potable Water",[83,87],{"id":84,"termTaxonomyId":85,"name":86,"description":86},"dGVybTo1MA==",50,"HDPE",{"id":88,"termTaxonomyId":89,"name":90,"description":90},"dGVybTo1Mw==",53,"Jacking Pipe",{"scope":92,"area":42,"areaType":42,"states":93,"display":48,"country":94,"countryCode":95,"suburb":96,"postcode":42,"state":42,"stateCode":42,"lga":42},"specific",[],"Australia","AU","Greenmount, QLD 4359 — Toowoomba",[],{"url":99,"alt":100},"https://fps.borely.com/wp-content/uploads/2025/08/j3907-bhp-mac-water-pipeline-future-proof-solutions-630.jpg","2026 / Greenmount to Cambooya-background",{"url":102,"alt":103},"https://fps.borely.com/wp-content/uploads/2025/08/j3907-bhp-mac-water-pipeline-future-proof-solutions-2880.jpg","2026 / Greenmount to Cambooya-card-background",{"title":16,"shortTitle":16,"description":16,"images":105},[],[107,121],{"name":108,"date":47,"location":48,"crossingTypes":109,"methods":111,"pipeTypes":113,"geology":116,"length":53,"depth":120,"diameter":50},"OTM1 – Greenmount Nobby Rd",[110],{"id":63,"name":65,"description":66},[112],{"id":74,"name":60,"description":76},[114,115],{"id":84,"name":86,"description":86},{"id":88,"name":90,"description":90},[117],{"id":118,"name":119,"description":119},"dGVybTo4Ng==","Rock/OTR",2.87,{"name":122,"date":47,"location":123,"crossingTypes":124,"methods":126,"pipeTypes":128,"geology":131,"length":52,"depth":133,"diameter":50},"OTM2 – Watts Siding & Henry Rd","Cambooya, QLD 4358 — Toowoomba, Australia",[125],{"id":68,"name":70,"description":71},[127],{"id":74,"name":60,"description":76},[129,130],{"id":84,"name":86,"description":86},{"id":88,"name":90,"description":90},[132],{"id":118,"name":119,"description":119},2.88,1789095579520]