[{"data":1,"prerenderedAt":174},["ShallowReactive",2],{"contact-global":3,"experience-629-2025-prince-charles-hospital-underbore":37},{"addresses":4,"emails":14,"phones":18,"socialLinks":28},[5,8,11],{"address":6,"countryCode":7},"177 Wellington Road, East Brisbane QLD 4169","AUS",{"address":9,"countryCode":10},"250 B Boulevard Saint-Germain, 75007 Paris","FR",{"address":12,"countryCode":13},"188 Quay Street, Auckland Central, Auckland 1010","NZ",[15],{"countryCode":16,"email":17},null,"info@futureproofsolutions.com.au",[19,22,25],{"countryCode":7,"longPhoneNumber":20,"shortPhoneNumber":21},"+61 1300 391 434","1300 391 434",{"countryCode":10,"longPhoneNumber":23,"shortPhoneNumber":24},"+33 01 82 72 61 24","01 82 72 61 24",{"countryCode":13,"longPhoneNumber":26,"shortPhoneNumber":27},"+64 09 973 4119","09 973 4119",[29,33],{"socialNetworkLink":30,"socialNetworkType":31},"https://www.facebook.com/people/Future-Proof-Solutions/100057368412879/",[32],"facebook",{"socialNetworkLink":34,"socialNetworkType":35},"https://au.linkedin.com/company/futureproof-solutions",[36],"linkedin",{"experience":38},{"seo":39,"title":40,"excerpt":44,"description":45,"projectStatus":46,"date":47,"detailedLocation":48,"boreholeDiameter":49,"crossingLength":52,"designTypes":55,"crossingTypes":69,"methods":85,"pipeUtilisations":90,"pipeTypes":98,"location":48,"smartLocation":103,"specifications":114,"background":115,"cardBackground":118,"sliderDescription":121,"crossings":123},{"title":40,"description":41,"keywords":42,"image":43},"2025 / Prince Charles Hospital Underbore","Four parallel HDD alignments were designed to install electrical and communications conduits as part of The Prince Charles Hospital Expansion in Chermside. The trenchless solution enabled essential underground services to be installed beneath internal roads and existing utilities while minimising disruption across the active hospital precinct.","",{"url":42,"alt":42},"\u003Cp>Four parallel HDD alignments were designed to install electrical and communications conduits as part of The Prince Charles Hospital Expansion in Chermside. The trenchless solution enabled essential underground services to be installed beneath internal roads and existing utilities while minimising disruption across the active hospital precinct.\u003C/p>\n","\u003Cp>As part of The Prince Charles Hospital Expansion in Chermside, four parallel horizontal directional drilling (HDD) alignments were designed to facilitate the installation of underground electrical and communications conduits supporting the hospital&#8217;s expanding infrastructure. The project included detailed HDD engineering design and supporting calculations to develop safe, practical and constructable trenchless solutions within an operational healthcare environment. The bore paths were carefully coordinated to cross internal roadways while navigating existing underground utilities and maintaining appropriate clearances throughout the hospital precinct. By adopting trenchless construction methods, the project minimised surface disruption, reduced impacts on hospital operations and surrounding infrastructure, and supported the delivery of reliable utility services for one of Queensland&#8217;s major hospital expansion projects.\u003C/p>\n","completed","2025","Chermside, QLD, Australia",{"min":50,"max":51},16,18,{"min":53,"max":54},73,140,[56,63],{"id":57,"slug":58,"title":59,"shortTitle":60,"excerpt":61,"method":62},"cG9zdDoxMDE=","horizontal-directional-drilling","Horizontal Directional Drilling(HDD) ","Simple Arrangement","\u003Cp>Standard HDD with straight alignment and simple profile geometry.\u003C/p>\n","HDD",{"id":64,"slug":65,"title":66,"shortTitle":67,"excerpt":68,"method":62},"cG9zdDoxMDQ=","hdd-complex-geometry","HDD Complex Geometry","Complex Geometry","\u003Cp>Complex HDD geometry using horizontal and additional vertical radii\u003C/p>\n",[70,75,80],{"id":71,"termTaxonomyId":72,"name":73,"description":74},"dGVybToxMg==",12,"ROAD","Road",{"id":76,"termTaxonomyId":77,"name":78,"description":79},"dGVybTo5",9,"ENV","Environmental",{"id":81,"termTaxonomyId":82,"name":83,"description":84},"dGVybToxMw==",13,"SVC","Service",[86],{"id":87,"termTaxonomyId":88,"name":62,"description":89},"dGVybToz",3,"Horizontal Directional Drilling",[91,94],{"id":92,"termTaxonomyId":53,"name":93,"description":93},"dGVybTo3Mw==","Telecommunications Cables",{"id":95,"termTaxonomyId":96,"name":97,"description":97},"dGVybTo3Mg==",72,"Electrical Cables",[99],{"id":100,"termTaxonomyId":101,"name":102,"description":102},"dGVybTo1MA==",50,"HDPE",{"scope":104,"area":42,"areaType":42,"states":105,"display":48,"country":109,"countryCode":110,"suburb":111,"postcode":112,"state":107,"stateCode":108,"lga":113},"specific",[106],{"name":107,"code":108},"Queensland","QLD","Australia","AU","Chermside","4032","Brisbane",[],{"url":116,"alt":117},"https://fps.borely.com/wp-content/uploads/2025/08/mulgoa-road-upgrade-project-stage-1-regentville-to-jamisontown-capability-statement-future-proof-solutions-630.jpg","2025 / Prince Charles Hospital Underbore-background",{"url":119,"alt":120},"https://fps.borely.com/wp-content/uploads/2025/08/mulgoa-road-upgrade-project-stage-1-regentville-to-jamisontown-capability-statement-future-proof-solutions-2880.jpg","2025 / Prince Charles Hospital Underbore-card-background",{"title":16,"shortTitle":16,"description":16,"images":122},[],[124,138,149,163],{"name":125,"date":47,"location":48,"crossingTypes":126,"methods":128,"pipeTypes":130,"geology":132,"length":136,"depth":137,"diameter":51},"HDD01a - Staib Rd",[127],{"id":71,"name":73,"description":74},[129],{"id":87,"name":62,"description":89},[131],{"id":100,"name":102,"description":102},[133],{"id":134,"name":135,"description":135},"dGVybTo3OQ==","OTR",74,4.64,{"name":139,"date":47,"location":48,"crossingTypes":140,"methods":142,"pipeTypes":144,"geology":146,"length":53,"depth":148,"diameter":50},"HDD01b - Staib Rd",[141],{"id":71,"name":73,"description":74},[143],{"id":87,"name":62,"description":89},[145],{"id":100,"name":102,"description":102},[147],{"id":134,"name":135,"description":135},4.68,{"name":150,"date":47,"location":48,"crossingTypes":151,"methods":153,"pipeTypes":155,"geology":157,"length":161,"depth":162,"diameter":50},"HDD02a - Staib Rd",[152],{"id":71,"name":73,"description":74},[154],{"id":87,"name":62,"description":89},[156],{"id":100,"name":102,"description":102},[158],{"id":159,"name":160,"description":160},"dGVybTo4Ng==","Rock/OTR",131,3.3,{"name":164,"date":47,"location":48,"crossingTypes":165,"methods":167,"pipeTypes":169,"geology":171,"length":51,"depth":173,"diameter":51},"HDD02b - Staib Rd",[166],{"id":71,"name":73,"description":74},[168],{"id":87,"name":62,"description":89},[170],{"id":100,"name":102,"description":102},[172],{"id":159,"name":160,"description":160},5.5,1789095596651]