[{"data":1,"prerenderedAt":127},["ShallowReactive",2],{"contact-global":3,"experience-690-2025-roxburghe-dr-hdd":37},{"addresses":4,"emails":14,"phones":18,"socialLinks":28},[5,8,11],{"address":6,"countryCode":7},"177 Wellington Road, East Brisbane QLD 4169","AUS",{"address":9,"countryCode":10},"250 B Boulevard Saint-Germain, 75007 Paris","FR",{"address":12,"countryCode":13},"188 Quay Street, Auckland Central, Auckland 1010","NZ",[15],{"countryCode":16,"email":17},null,"info@futureproofsolutions.com.au",[19,22,25],{"countryCode":7,"longPhoneNumber":20,"shortPhoneNumber":21},"+61 1300 391 434","1300 391 434",{"countryCode":10,"longPhoneNumber":23,"shortPhoneNumber":24},"+33 01 82 72 61 24","01 82 72 61 24",{"countryCode":13,"longPhoneNumber":26,"shortPhoneNumber":27},"+64 09 973 4119","09 973 4119",[29,33],{"socialNetworkLink":30,"socialNetworkType":31},"https://www.facebook.com/people/Future-Proof-Solutions/100057368412879/",[32],"facebook",{"socialNetworkLink":34,"socialNetworkType":35},"https://au.linkedin.com/company/futureproof-solutions",[36],"linkedin",{"experience":38},{"seo":39,"title":40,"excerpt":44,"description":45,"projectStatus":46,"date":47,"detailedLocation":48,"boreholeDiameter":49,"crossingLength":51,"designTypes":53,"crossingTypes":67,"methods":78,"pipeUtilisations":83,"pipeTypes":88,"location":48,"smartLocation":93,"specifications":104,"background":105,"cardBackground":108,"sliderDescription":111,"crossings":113},{"title":40,"description":41,"keywords":42,"image":43},"2025 / Roxburghe DR HDD","HDD design and engineering support were provided for underground utility works along Roxburghe Drive, supporting the installation of a Water Corporation water product pipe while minimising surface disruption and maintaining existing infrastructure.","",{"url":42,"alt":42},"\u003Cp>HDD design and engineering support were provided for underground utility works along Roxburghe Drive, supporting the installation of a Water Corporation water product pipe while minimising surface disruption and maintaining existing infrastructure.\u003C/p>\n","\u003Cp>The Roxburghe Drive utility upgrade project involved the design of a trenchless crossing to support underground infrastructure works along the existing utility corridor. HDD engineering design and supporting calculations were developed for the installation of a Water Corporation water product pipe, providing a safe and constructable trenchless solution within a constrained urban environment. The proposed alignment considered varying subsurface conditions, including Bassendean Sand, Guildford Formation clayey sand and localised clay, to optimise constructability and minimise installation risks. By adopting horizontal directional drilling techniques, the project reduced the need for open excavation, minimised impacts on surrounding infrastructure and traffic, and supported the efficient delivery of essential underground utility services along Roxburghe Drive.\u003C/p>\n","completed","2025","The Vines, WA, Australia",{"min":50,"max":50},14,{"min":52,"max":52},408,[54,61],{"id":55,"slug":56,"title":57,"shortTitle":58,"excerpt":59,"method":60},"cG9zdDoxMDE=","horizontal-directional-drilling","Horizontal Directional Drilling(HDD) ","Simple Arrangement","\u003Cp>Standard HDD with straight alignment and simple profile geometry.\u003C/p>\n","HDD",{"id":62,"slug":63,"title":64,"shortTitle":65,"excerpt":66,"method":60},"cG9zdDoxMDQ=","hdd-complex-geometry","HDD Complex Geometry","Complex Geometry","\u003Cp>Complex HDD geometry using horizontal and additional vertical radii\u003C/p>\n",[68,73],{"id":69,"termTaxonomyId":70,"name":71,"description":72},"dGVybToxMg==",12,"ROAD","Road",{"id":74,"termTaxonomyId":75,"name":76,"description":77},"dGVybTo5",9,"ENV","Environmental",[79],{"id":80,"termTaxonomyId":81,"name":60,"description":82},"dGVybToz",3,"Horizontal Directional Drilling",[84],{"id":85,"termTaxonomyId":86,"name":87,"description":87},"dGVybTo1Ng==",56,"Potable Water",[89],{"id":90,"termTaxonomyId":91,"name":92,"description":92},"dGVybTo1MA==",50,"HDPE",{"scope":94,"area":42,"areaType":42,"states":95,"display":48,"country":99,"countryCode":100,"suburb":101,"postcode":102,"state":97,"stateCode":98,"lga":103},"specific",[96],{"name":97,"code":98},"Western Australia","WA","Australia","AU","The Vines","6069","Swan",[],{"url":106,"alt":107},"https://fps.borely.com/wp-content/uploads/2025/08/mardi-to-warnervale-pipeline-hdil-future-proof-solutions-copy-630.jpg","2025 / Roxburghe DR HDD-background",{"url":109,"alt":110},"https://fps.borely.com/wp-content/uploads/2025/08/cairns-water-security-stage-1-project-capability-statement-future-proof-solutions-2880.jpg","2025 / Roxburghe DR HDD-card-background",{"title":16,"shortTitle":16,"description":16,"images":112},[],[114],{"name":115,"date":47,"location":48,"crossingTypes":116,"methods":118,"pipeTypes":120,"geology":122,"length":52,"depth":126,"diameter":50},"HDD01 – Roxburghe DR",[117],{"id":69,"name":71,"description":72},[119],{"id":80,"name":60,"description":82},[121],{"id":90,"name":92,"description":92},[123],{"id":124,"name":125,"description":125},"dGVybTo3OQ==","OTR",3.07,1789095580225]