Pulling Head Calculation
Detailed analysis of the torque and drag forces impacting tooling at each stage of construction
Select from our suite of engineered design products to plan your trenchless crossing and account for the construction risks at play.
Detailed analysis of the torque and drag forces impacting tooling at each stage of construction
Detailed analysis of the torque and drag forces impacting tooling at each stage of construction
Validates the strength, size and configuration of anchors for the safe installation of pipes
An assessment of the forces imposed on a pipe during installation
Detailed analysis of the torque and drag forces impacting tooling at each stage of construction
Detailed analysis of the torque and drag forces impacting tooling at each stage of construction
Validates the strength, size and configuration of anchors for the safe installation of pipes
An assessment of the forces imposed on a pipe during installation
An assessment to verify the integrity of an enveloper pipe to withstand installation and operational pressures
An assessment to verify the integrity of a product/carrier pipe to withstand installation and operational pressures
Analysis of the potential hydrofracture risk along the length of a crossing
Analysis of the settlement potential of the area surrounding a crossing
Analyses the potential vibration impact to nearby objects attributable to trenchless works
A plan prescribing the volume and substance of ballast neccessary to safely install a pipe
Detailed layout identifying the survey monitoring points required to measure settlement along a crossing
Detail on the type, volume and composition of drilling fluid required for construction
A detailed summary of the key euqipment and tooling required for construction
Graphical storyboard depicting each stage of a crossing construction
A plan prescribing the volume and properties of grout to stabilise an annulus
A template log to accurately record the as-constructed data for a crossing
A quality control document that outlines the specific steps, tests and verifications required during a project
Detailed drawing of the pulling head specification to the product pipe and installation forces
A drawing depicting the constructed pipeline or service based on construction logs or survey
A drawing prescribing the location and type of geotechincal investigations required to support design and construction of a crossing
Detailed drawing of the anchor block specific to the rig and installation forces
Designed geometry of the pipe breakover to facilitate installation of a trenchless crossing
Designed geometry of a trenchless crossing
A layout configuring the welding and stringing activities to form a pipe string for installation
Maps anticipated noise impact from trenchless construction
Plans and illustrates layout of the trenchless site and equipment
Specialist trenchless equipment packages to support planning, temporary works, monitoring and site support — available for hire wherever your project is delivered.